Residential Structure Fire

Bluff Pointe

The Dandridge Fire Department responded to a working residentail structure fire August 31, 2015 at 0632 hours. Before crews could arrive the structure would be overtaken by the fire with extension to a storage shed which contained four 30 pound propane cylinders. The shed was quickly extinguished and the attention was placed on the single wide trailer. Engine 3 (New Market VFD), Engine 774, Engine 772, Tanker 780 and Support/Rehab 781 would be on scene for an estimated three hours making sure the fire was out. Lakeway Central VFD would be called up to cover the DFD district.

Photo taken by: W. Holt

Leave a Reply

Your email address will not be published. Required fields are marked *