All posts by 28

Final Inspection

Final Inspection of DFD’s NEW Engine 7 took place on May 30, 2019 as Chief Riley and Driver/Operator Kevin Rimm traveled to Pierce Manufacturing in Florida. The next stop for the new piece, Dandridge, TN.